Skip Navigation

NCAGR.GOV

Cost Share Programs - Community Conservation Assistance Program (CCAP)

AgWRAP Logo

Bioretention Area

The use of plants and soils for removal of pollutants from stormwater runoff. Bioretntion can also be effective in reducing peak runoff rates, runoff volumes and recharging groundwater by infiltrating runoff.

Maintenance Period
  • 5 years single-family home, 10 years all other properties
BMP Units
  • Square feet
Required Effects
JAA/NRCS Standards
  • Requires a Professional Engineer stamped design
Cost Information
  • Actual cost - paid based on receipts
  • Maxmimum cost share amount of $20,00 for all CCAP BMPs including all components
CS2 Reference Materials
  • NC-CCAP 11 Signature Page
  • Map with BMP location, parcels and roads
  • Receipts for actual cost items
Additional Spot-check Requirements
  • None


CCAP Policy Summary

Common CS2 Components

Component Units
Bioretention areas SqFt
CCAP - Bioretention areas - engineering Job

 

Design Standards

Planning and Design Tools

Trainings

NCDA&CS Division of Soil & Water Conservation, David B. Williams, Director
Mailing Address: 1614 Mail Service Center, Raleigh NC 27699-1614
Physical Address: 216 West Jones Street, Raleigh North Carolina 27603
Phone: 919.707.3770


How can we make this page better for you?
Contact the NCDA&CS

Found a bug? Have a suggestion? Fill out the form below and we'll take a look!

Your Name:
Your E-mail:
Subject:
Question or Comments:

Back to top

Get Email Alerts

Stay up to date with NCDA&CS. Sign up to receive the latest news and upcoming events via email.