Skip Navigation

NCAGR.GOV

Cost Share Programs - Community Conservation Assistance Program (CCAP)

AgWRAP Logo

Structural Stormwater Conveyance

Various techniques to divert runoff from paved surfaces where a vegetated diversion is not feasible. The purpose is to direct stormwater runoff (sheet flow or concentrated) away from a direct discharge point and divert it to an approved BMP or naturally vegetated area capable of removing nutrients through detention, filtration, or infiltration. This may be accomplished through the use of the following: curb cuts, trench drains, raised concrete or asphalt areas in parking lots, earthen berms or check dams.

Maintenance Period
  • 5 years single-family home, 10 years all other properties
BMP Units
  • Each
Required Effects
  • Soil loss reductions
    Use RUSLE2 or volumetric calculation
JAA/NRCS Standards
  • Design must be signed and sealed by a Professional Engineer
Cost Information
  • Actual cost - paid based on receipts
  • Maxmimum cost share amount of $4,000 each for construction
CS2 Reference Materials
  • NC-CCAP 11 Signature Page
  • Map with BMP location, parcels and roads
  • Receipts for actual cost items
Additional Spot-check Requirements
  • None


CCAP Policy Summary

Common CS2 Components

Component Units
Structural Stormwater Conveyance Each
Structural Stormwater Conveyance - engineering Job

 

Design Standards

Planning and Design Tools

Trainings

NCDA&CS Division of Soil & Water Conservation, Vernon Cox, Director
Mailing Address: 1614 Mail Service Center, Raleigh NC 27699-1614
Physical Address: 216 West Jones Street, Raleigh North Carolina 27603
Phone: 919.707.3770


How can we make this page better for you?
Contact the NCDA&CS

Found a bug? Have a suggestion? Fill out the form below and we'll take a look!

Your Name:
Your E-mail:
Subject:
Question or Comments:

Back to top

Get Email Alerts

Stay up to date with NCDA&CS. Sign up to receive the latest news and upcoming events via email.