Description: A system of components that provide containment and a barrier to the movement of agrichemicals. The purpose of the system is to provide secondary containment to prevent degradation of surface water, groundwater, and soil from unintentional release of pesticides or fertilizers.
Agrichemical Containment and Mixing Facility Policy
Requirements for Agrichemical Pollution Prevention Measures
General Policies for Commission Cost Share Programs
Maintenance Period: 10 years
Additional Spot Check Requirements: None
BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.
CS2 Project Description examples
Expected Results:
Acres affected
Reference Materials:
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.
Operation and Maintenance Plan Statement
CS2 Common Components | Units |
---|---|
AGRICHEMICAL CONTAINMENT AND MIXING FACILITY | Each |
JAA:
NRCS - 309 - Agrichemical Handling Facility
Refer to the SWCC JAA Application Requirements for details.
None