Description: Remove sediment from existing agricultural ponds to increase water storage capacity. Benefits may include water supply, erosion control, flood control, and sediment and nutrient reductions from farm fields.
Agricultural Pond Sediment Removal Policy
Requirements for all Sediment and Nutrient Management Measures.
General Policies for Commission Cost Share Programs
Maintenance Period: 1 year
Additional Spot Check Requirements: None
BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.
CS2 Project Description examples
Expected Results: Sediment removal plan values for soil loss reduction.
Reference Materials:
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.
Operation and Maintenance Form
CS2 Common Components | Units |
---|---|
AGRICULTURAL POND - Sediment Removal Only | Each |
JAA:
Division Pond Sediment Removal Plan signed by a professional engineer or individual with appropriate job approval authority.
NRCS - 378 - Pond
Refer to the SWCC JAA Application Requirements for details.