Tab/Accordion Items

Description: Repair or stabilization of existing access roads utilized for agricultural operations, including roads to existing crop fields, pastures, and barns.

Agricultural Road Repair/Stabilization Policy
Requirements for all Sediment and Nutrient Management Measures.
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: The district shall inspect the site at least every two (2) years during the maintenance period.

BMP Units: Lin Ft
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Acres affected - (drainage area)
Soil saved - NRCS Gully Erosion Tool

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

CS2 Common Components Units
FILTER CLOTH - geotextile fabric SqYd
GRADING - extra heavy, 9" - 12" avg Acre
GRADING - heavy, 6" - 9" avg Acre
GRADING - medium, <=6" avg Acre
GRADING - maximum heavy >12" avg Acre
GRADING - minimum, <= 1/4 acre Acre
PIPE - CORRUGATED METAL, galvanized and bituminous coated with paved invert, 16 ga., various sizes - includes excavation and backfill LinFt
PIPE - CORRUGATED METAL, galvanized uncoated, various gauges and sizes - includes excavation and backfill LinFt
PIPE - CORRUGATED ALUMINUM, various gauges and sizes - includes excavation and backfill LinFt
PIPE - CORRUGATE STORMWATER, TYPE S, SMOOTH WALL, various sizes - includes excavation and backfill LinFt
PIPE - REINFORCED CONCRETE (RCP), class 3, various sizes - includes excavation and backfill LinFt
STONE - gravel Ton
STONE - riprap Ton
VEGETATION - bag lime, seed and fertilizer Acre
VEGETATION - hydroseed Acre
VEGETATION - establish, native species for riparian areas only Acre
VEGETATION - mulch, small grain straw Acre