Tab/Accordion Items

Description: An accompanying best management practice (BMP) to provide stabilized access to agriculture BMPs to reduce erosion and improve water quality.  This accompanying BMP is not intended to be used to construct new roads.

All-Season Agricultural Access Policy
Requirements for all Sediment and Nutrient Management Measures.
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: The district shall inspect the site at least every two (2) years during the maintenance period.

BMP Units: Lin Ft
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Acres affected
Soil saved

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

CS2 Common Components Units
FILTER CLOTH - geotextile fabric SqYd
GRADING - extra heavy, 9" - 12" avg Acre
GRADING - heavy, 6" - 9" avg Acre
GRADING - medium, <=6" avg Acre
GRADING - maximum heavy >12" avg Acre
GRADING - minimum, <= 1/4 acre Acre
PIPE - CORRUGATE STORMWATER, TYPE S, SMOOTH WALL, various sizes - includes excavation and backfill Lin Ft
STONE - gravel Ton
STONE - riprap Ton
VEGETATION - bag lime, seed and fertilizer Acre
VEGETATION - mulch, small grain straw Acre

None