Tab/Accordion Items

Description: A Critical Area Planting means an area of highly erodible land that cannot be stabilized by ordinary conservation treatment on which permanent perennial vegetative cover is established and protected to improve water quality.  Benefits may include reduced soil erosion and sedimentation.

Critical Area Planting Policy
Requirements for Erosion and Nutrient Management Measures
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Soil saved
Phosphorus saved - if erosion is present
Acres affected - (planted acres)

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

CS2 Common Components Units
FILTER CLOTH - geotextile fabric SqYd
GRADING - extra heavy, 9"-12" avg Acre
GRADING - heavy, 6"- 9" avg Acre
GRADING - medium <=6" avg Acre
GRADING - maximum heavy >12" avg Acre
GRADING - minimum, <= 1/4 acre Job
EROSION CONTROL MATTING - LONG TERM - TRM OR 700 GRAM COIR SqYd
EROSION CONTROL MATTING - TEMP, 12 MONTHS or less LONGEVITY SqYd
EROSION CONTROL MATTING - TEMP, 18-36 MONTHS LONGEVITY SqYd
EROSION CONTROL MATTING - TEMP, <400 SQ FT STRAW 12 MONTHS or less LONGEVITY SqFt
VEGETATION - bag lime, seed and fertilizer Acre
VEGETATION - bulk lime, seed and fertilizer Acre
VEGETATION - hydroseed Acre
VEGETATION - establish, native species for riparian areas only Acre
VEGETATION - mulch, small grain straw Acre
VEGETATION - seedbed prep Acre

None