Tab/Accordion Items

Description: A Diversion means a channel constructed across a slope with a supporting ridge on the lower side to control drainage by diverting excess water from an area to improve water quality. Benefits may include reduced soil erosion, sedimentation, and pollution from dissolved and sediment-attached substances.

Diversion Policy
Requirements for Erosion and Nutrient Management Measures
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Lin Ft
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Soil saved
Phosphorus saved - (if erosion present)
Acres affected - (planted acres and drainage area)

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

CS2 Common Components Units
EARTH FILL ADJACENT, COMPACTED CuYd
EARTH FILL HAULED CuYd
EARTH FILL HAULED, COMPACTED CuYd
EARTH FILL- ADJACENT (WITHIN 300 YDS) CuYd
EROSION CONTROL MATTING - TEMP, 12 MONTHS or less LONGEVITY SqYd
EROSION CONTROL MATTING - TEMP, 18-36 MONTHS LONGEVITY SqYd
EROSION CONTROL MATTING - TEMP, < 400 SQ FT, STRAW -12 MONTHS OR LESS LONGEVITY SqFt
EXCAVATION - w/spoil removal CuYd
GRADING - medium, <=6" avg Acre
GRADING - heavy, 6"-9" avg Acre
GRADING - extra heavy 9"-12" avg Acre
GRADING - maximum heavy >12" avg Acre
GRADING-minimum, <=1/4 acre Job
LAND SMOOTHING - heavy Acre
LAND SMOOTHING - light Acre
SMOOTH/SHAPE - tractor disk/blade Acre
FILTER CLOTH - geotextile fabric SqYd
STONE - gravel Ton
STONE - riprap Ton
VEGETATION - bag lime, seed and fertlizer Acre
VEGETATION - bulk lime, seed and fertilizer Acre
VEGETATION - mulch, small grain straw Acre
VEGETATION - seedbed prep Acre

None