Tab/Accordion Items

Description: A Filter Strip means an area of permanent perennial vegetation for removing sediment, organic matter, and other pollutants from runoff and waste water to improve water quality.  Benefits may include reduced soil erosion, sedimentation, pathogen contamination, and pollution from dissolved, particulate, and sediment-attached substances.

Filter Strip Policy
Requirements for all Sediment and Nutrient Management Measures.
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Acres
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Acres affected
Soil saved
Nitrogen saved
Phosphorus saved

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

 

CS2 Common ComponentsUnits
GRADING - extra heavy, 9" - 12" avgAcre
GRADING - heavy, 6" - 9" avgAcre
GRADING - medium, <=6" avgAcre
GRADING - maximum heavy >12" avgAcre
GRADING - minimum, <= 1/4 acreAcre
VEGETATION - bag lime, seed and fertilizerAcre
VEGETATION - bulk lime, seed and fertilizerAcre
VEGETATION - seedbed prepAcre
VEGETATION - mulch, small grain strawAcre
EROSION CONTROL MATTING - TEMP, 12 MONTHS, or less LONGEVITYSqYd
EROSION CONTROL MATTING - TEMP, 18 - 36 MONTHS LONGEVITYSqYd
EROSION CONTROL MATTING - TEMP, <400 SQ FT, STRAW - 12 MONTHS or less LONGEVITYSqFt