Description: A Rock-lined Outlet means a waterway having an erosion-resistant lining of concrete, stone, or other permanent material where an unlined or grassed waterway would be inadequate to improve water quality.  Benefits may include safe disposal of runoff, reduced erosion, and sedimentation.

Rock-lined Outlet Policy
Requirements for all Sediment and Nutrient Management Measures.
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Acres affected
Soil saved

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

 

CS2 Common Components Units
ABANDONED TREE REMOVAL Acre
CLEARING - removing woods Acre
EARTH FILL HAULED CuYd
EXCAVATION - w/spoil removal CuYd
GRADING - extra heavy, 9" - 12" avg Acre
GRADING - heavy, 6" - 9" avg Acre
GRADING - maximum heavy >12" avg Acre
GRADING - minimum, <= 1/4 acre Acre
PIPE FITTING - Corrugated Polyethylene Each
PIPE FITTING - stormwater Each
PIPE - CORRUGATED STORMWATER, TYPE S, SMOOTH WALL,various sizes - includes excavation and backfill LinFt
PIPE - CORRUGATED PLASTIC, polyethylene, double wall, various sizes - does not include excavation LinFt
STONE - gravel Ton
STONE - riprap Ton
VEGETATION - bag lime, seed and fertilizer Acre
VEGETATION - bulk lime, seed and fertilizer Acre
VEGETATION - seedbed prep Acre
VEGETATION - mulch, small grain straw Acre
EROSION CONTROL MATTING - TEMP, 12 MONTHS, or less LONGEVITY SqYd
EROSION CONTROL MATTING - TEMP, 18 - 36 MONTHS LONGEVITY SqYd
EROSION CONTROL MATTING - TEMP, <400 SQ FT, STRAW - 12 MONTHS or less LONGEVITY SqFt