Tab/Accordion Items

Description: A Rock-lined Outlet means a waterway having an erosion-resistant lining of concrete, stone, or other permanent material where an unlined or grassed waterway would be inadequate to improve water quality.  Benefits may include safe disposal of runoff, reduced erosion, and sedimentation.

Rock-lined Outlet Policy
Requirements for all Sediment and Nutrient Management Measures.
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Acres affected
Soil saved

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

 

CS2 Common ComponentsUnits
ABANDONED TREE REMOVALAcre
CLEARING - removing woodsAcre
EARTH FILL HAULEDCuYd
EXCAVATION - w/spoil removalCuYd
GRADING - extra heavy, 9" - 12" avgAcre
GRADING - heavy, 6" - 9" avgAcre
GRADING - maximum heavy >12" avgAcre
GRADING - minimum, <= 1/4 acreAcre
PIPE FITTING - Corrugated PolyethyleneEach
PIPE FITTING - stormwaterEach
PIPE - CORRUGATED STORMWATER, TYPE S, SMOOTH WALL,various sizes - includes excavation and backfillLinFt
PIPE - CORRUGATED PLASTIC, polyethylene, double wall, various sizes - does not include excavationLinFt
STONE - gravelTon
STONE - riprapTon
VEGETATION - bag lime, seed and fertilizerAcre
VEGETATION - bulk lime, seed and fertilizerAcre
VEGETATION - seedbed prepAcre
VEGETATION - mulch, small grain strawAcre
EROSION CONTROL MATTING - TEMP, 12 MONTHS, or less LONGEVITYSqYd
EROSION CONTROL MATTING - TEMP, 18 - 36 MONTHS LONGEVITYSqYd
EROSION CONTROL MATTING - TEMP, <400 SQ FT, STRAW - 12 MONTHS or less LONGEVITYSqFt

None