Description: A Rock-lined Outlet means a waterway having an erosion-resistant lining of concrete, stone, or other permanent material where an unlined or grassed waterway would be inadequate to improve water quality. Benefits may include safe disposal of runoff, reduced erosion, and sedimentation.
Rock-lined Outlet Policy
Requirements for all Sediment and Nutrient Management Measures.
General Policies for Commission Cost Share Programs
Maintenance Period: 10 years
Additional Spot Check Requirements: None
BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.
CS2 Project Description examples
Expected Results:
Acres affected
Soil saved
Reference Materials:
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.
CS2 Common Components | Units |
---|---|
ABANDONED TREE REMOVAL | Acre |
CLEARING - removing woods | Acre |
EARTH FILL HAULED | CuYd |
EXCAVATION - w/spoil removal | CuYd |
GRADING - extra heavy, 9" - 12" avg | Acre |
GRADING - heavy, 6" - 9" avg | Acre |
GRADING - maximum heavy >12" avg | Acre |
GRADING - minimum, <= 1/4 acre | Acre |
PIPE FITTING - Corrugated Polyethylene | Each |
PIPE FITTING - stormwater | Each |
PIPE - CORRUGATED STORMWATER, TYPE S, SMOOTH WALL,various sizes - includes excavation and backfill | LinFt |
PIPE - CORRUGATED PLASTIC, polyethylene, double wall, various sizes - does not include excavation | LinFt |
STONE - gravel | Ton |
STONE - riprap | Ton |
VEGETATION - bag lime, seed and fertilizer | Acre |
VEGETATION - bulk lime, seed and fertilizer | Acre |
VEGETATION - seedbed prep | Acre |
VEGETATION - mulch, small grain straw | Acre |
EROSION CONTROL MATTING - TEMP, 12 MONTHS, or less LONGEVITY | SqYd |
EROSION CONTROL MATTING - TEMP, 18 - 36 MONTHS LONGEVITY | SqYd |
EROSION CONTROL MATTING - TEMP, <400 SQ FT, STRAW - 12 MONTHS or less LONGEVITY | SqFt |
JAA:
NRCS - 468 - Lined Waterway or Outlet
Refer to the SWCC JAA Application Requirements for details.
None