Tab/Accordion Items

Description: A Rooftop Runoff Management System means a system of collection and stabilization practices (drip line stabilization, guttering, collection boxes, etc.) to prevent rainfall runoff from agricultural rooftops from causing erosion where vegetative practices are insufficient to address erosion concerns and protect water quality. 

Rooftop Runoff Managment Policy
Requirements for Erosion and Nutrient Management Measures
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Soil saved
Acres affected - (treated area)

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

CS2 Common ComponentsUnits
FILTER CLOTH - Geotextile fabricSqYd
GRADING - Medium, <=6in avgAcre
GRADING - Minimum, <=1/4 acreAcre
EROSION CONTROL MATTING - TEMP, 12
MONTHS or less LONGEVITY
SqYd
EROSION CONTROL MATTING - TEMP, 18-36 MONTHS LONGEVITYSqYd
EROSION CONTROL MATTING - TEMP, < 400 SQ FT, STRAW -12 MONTHS OR LESS LONGEVITYSqFt
PIPE - CORRUGATED METAL, galvanized and bituminous coated with paved invert, various gauges and sizes- includes excavation and backfillLinFt
PIPE - Perf drain w/ 2'X2' GRAVEL FILTER, INCLUDES EXCAVATION/BACKFILL OF 2'X3' PER LFLinFt
PIPE - Polyvinyl Chloride 6" (does not include excavation)Each
PIPE FITTING - Corrugated Polyethylene 6"Each
STONE - gravelTon
STONE - riprapTon
VEGETATION ‐ bag lime, seed and fertilizerAcre
VEGETATION - seedbed prepAcre
GUTTERS-assembled alum/vinyl 5" LinFt
GUTTERS-assembled alum/vinyl 6"LinFt
GUTTERS-downspoutsLinFt
GUTTERS-seamless alum 5"LinFt
GUTTERS-seamless alum 6" LinFt

JAA:
NRCS - 558 - Roof Runoff Structure

NRCS Supporting Standards: None

Refer to the SWCC JAA Application Requirements for details.