Description: A Sediment Basin means a constructed basin to trap and store waterborne sediment where physical conditions or land ownership preclude treatment of a sediment source by the installation of other erosion control measures to improve water quality.
Sediment Basin Policy
Requirements for all Sediment and Nutrient Management Measures.
General Policies for Commission Cost Share Programs
Maintenance Period: 10 years
Additional Spot Check Requirements: None
BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.
CS2 Project Description examples
Expected Results:
Acres affected - (drainage area)
Soil saved
Nitrogen saved
Phosphorus saved
Reference Materials:
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.
CS2 Common Components | Units |
---|---|
CATCH BASIN | Job |
JAA:
NRCS - 638 - Water and Sediment Control Basin
NRCS - 350 - Sediment Basin
NRCS Supporting Standard
NRCS - 378 - Pond
Refer to the SWCC JAA Application Requirements for details.