Tab/Accordion Items

Description: A system for the removal, storage, and dewatering of solid waste from the effluent of tank or raceway-based aquaculture production systems.

To capture organic solids from the effluent stream of fish production systems.  These solids come from uneaten feed and waste generated by fish within the aquaculture production systems.

Solids Separation from Tank/Raceway-Based Aquaculture Production Policy
Requirements for Waste Management Measures
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: All waste management systems for operations not permitted by the Division of Water Resources must be spot-checked annually for five years following implementation.

BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Acres affected
Animal type
Animal units
N and P waste managed

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.
NC-ACSP-WMP Form

CS2 Common ComponentsUnits
SOLIDS SEPARATION FROM TANK-BASED AQUACULTUREEach