Tab/Accordion Items

Description: Spring Development means improving springs and seeps by excavating, cleaning, capping, or providing collection and storage facilities.

Spring Development Policy
Requirements for Stream Protection Management Measures
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Each
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Acres affected
Animal type
Animal units

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

CS2 Common ComponentsUnits
EXCAVATION - Spring development/Stream PickupHr
FILTER CLOTH - Geotextile fabricSqYd
HEADWALL - concrete - includes steel reinforcementCuYd
 
HEADWALL - sand cement bag >=60 lbBag
PIPE - Perf drain w/ 2'X2' GRAVEL FILTER, INCLUDES EXCAVATION/BACKFILL OF 2'X3'
PER LF
LinFt
PIPE - Perf drain w/o filter, INCLUDES EXCAVATION/BACKFILL OF 2'X3' PER LFLinFt
PIPE - Polyvinyl Chloride 1 1/2" or less (does not include excavation)Each
PIPE - Polyvinyl Chloride 2" (does not include excavation)Each
PIPE - Polyvinyl Chloride 3" (does not include excavation)Each
PIPE - Polyvinyl Chloride 4" (does not include excavation)Each
PIPE - Polyvinyl Chloride 6" (does not include excavation)Each
PIPE - PE Water supply/fittings, <=2in, includes trenchingEach
PIPE FITTING - Polyvinyl Chloride <=3"Each
PIPE FITTING - Polyvinyl Chloride 4"Each
Spring Header CasingEach
STONE - gravelTon
STONE - riprapTon
VEGETATION ‐bag lime, seed and fertilizerAcre
VEGETATION - establish, native species for riparian areas onlyAcre
VEGETATION - mulch, small grain strawAcre

None