Tab/Accordion Items

Description: A stable area used frequently and intensively for livestock movement by surfacing with suitable material to improve water quality.  Benefits may include reduced soil erosion, sedimentation, and pollution from dissolved, particulate, and sediment-attached substances.

Stocktrails and Walkways Policy
Requirements for Stream Protection Management Measures
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Square Yards (SqYd)
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Acres affected
Animal type
Animal units

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

CS2 Common ComponentsUnits
STOCK TRAIL - fine grading, geotextile, stone (does not include excavation)LinFt
STOCK TRAIL - fine grading, establish vegetationLinFt
FILTER CLOTH - geotextile fabricSqYd
STONE - Boulders (installed)Ton
STONE - gravelTon
VEGETATION - bag lime, seed and fertilizerAcre
VEGETATION - bulk lime, seed and fertilizerAcre
VEGETATION - mulch, small grain strawAcre
VEGETATION - seedbed prepAcre
EROSION CONTROL MATTING - TEMP, 12 MONTHS or less LONGEVITYSqYd
EROSION CONTROL MATTING - TEMP, 18-36 MONTHS LONGEVITYSqYd
EROSION CONTROL MATTING - TEMP, < 400 SQ FT, STRAW -12 MONTHS OR LESS LONGEVITYSqFt
EARTH FILL - hauledCuYd
EARTH FILL - hauled, compactedCuYd
EARTH FILL - hauled, compactCuYd
GRADING - extra heavy 9"-12" avgAcre
GRADING - heavy, 6"-9" avgAcre
GRADING - maximum heavy >12" avgAcre
GRADING - medium, <=to 6" avgAcre
GRADING - minimum, <=1/4 acreJob

JAA:
NRCS - 575 - Trail and Walkways
NRCS – 382 - Fence

NRCS Supporting Standard: None

Refer to the SWCC JAA Application Requirements for details.