Tab/Accordion Items

Description: Streambank and Shoreline Protection means the use of vegetation to stabilize and protect banks of streams, lakes, estuaries, or excavated channels against scour and erosion.  This practice should be used to prevent the loss of land or damage to utilities, roads, buildings, or other facilities adjacent to the banks, to maintain the capacity of the channel, to control channel meander that would adversely affect downstream facilities, to reduce sediment load causing downstream damages and pollution, or to improve the stream for recreation or fish and wildlife habitat.

Streambank and Shoreline Protection Policy
Requirements for all Sediment and Nutrient Management Measures.
General Policies for Commission Cost Share Programs

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Lin Ft
Cost Information: Average cost (75% or 90%). Refer to ACSP Average Cost Lists for details.

CS2 Project Description examples

Expected Results: 
Acres affected - (treated area and buffer)
Soil saved - (Estimates of streambank/shoreline erosion in tons/yr. May be substituted for soil loss calculations)

Reference Materials: 
NC-ACSP-11 Signature Page
Map with BMP location, fields, and roads
For 90% Cost share, please upload the NC-CSPs-1E form.

CS2 Common Components Units
EARTH FILL HAULED CuYd
EXCAVATION - w/spoil removal CuYd
FILTER CLOTH - Geotextile fabric SqYd
GRADING - extra heavy, 9" - 12" avg Acre
GRADING - heavy, 6" - 9" avg Acre
GRADING - medium, <=6" avg Acre
GRADING - maximum heavy >12" avg Acre
GRADING - minimum, <= 1/4 acre Acre
VEGETATION - bag lime, seed and fertilizer Acre
VEGETATION - establish, native species for riparian areas only Acre
VEGETATION - Hydroseed Acre
VEGETATION - Livestakes (installed) Each
VEGETATION - seedbed prep Acre
VEGETATION - mulch, small grain straw Acre
VEGETATION - Tree/Shrub Bare Root Seedlings Each
EROSION CONTROL MATTING - TEMP, 12 MONTHS, or less LONGEVITY SqYd
EROSION CONTROL MATTING - TEMP, 18 - 36 MONTHS LONGEVITY SqYd
EROSION CONTROL MATTING - TEMP, <400 SQ FT, STRAW - 12 MONTHS or less LONGEVITY SqFt
PIPE FITTING - Corrugated Polyethylene Each
PIPE FITTING - Polyvinyl Chloride Each
PIPE FITTING - stormwater Each
PIPE - CORRUGATED STORMWATER, TYPE S, SMOOTH WALL,various sizes - includes excavation and backfill LinFt
PIPE - CORRUGATED PLASTIC, polyethylene, double wall, various sizes - does not include excavation LinFt
PIPE - Polyvinyl Chloride - various sizes (does not include excavation) LinFt
STONE - Boulders (installed) Ton
STONE - gravel Ton
STONE - riprap Ton

NRCS Engineering Field Handbook Chapter 16