Tab/Accordion Items

Description: Baseflow interceptor means improving springs and seeps alongside a stream, near the banks, but not in the channel by excavating, cleaning, capping to collect and/or store water for agricultural use.  Benefits may include water supply, erosion control and flood control.

AgWRAP Baseflow Interceptor Policy 

Maintenance Period: 10 years

Additional Spot Check Requirements: None

BMP Units: Each
Cost Information: Average and Actual costs for components on AgWRAP and ACSP average cost lists. BMP cap of $15,000.

CS2 Project Description examples

Expected Results:

  • Acres irrigated (annually), or
  • Number and type of livestock watered

Reference Materials:

CS2 Component Unit
EXCAVATION- Spring development (Backhoe) Each
EXCAVATION- Spring development (Trackhoe)  Each
EARTH FILL-adjacent, sheepsfoot rolled   Each
EARTH FILL-hauled    CuYd CuYd
EARTH FILL-hauled, sheepsfoot rolled     CuYd
JUNCTION BOX-Concrete     Each
STONE-gravel     Ton
STONE-Riprap     Ton
FILTER CLOTH-geotextile fabric     SqYd
PIPE FITTING-Polyvinyl Chloride 4in     Each
PIPE FITTING-Polyvinyl Chloride <=3in     Each
PIPE FITTING-Polyvinyl Chloride <=3in     LnFt
PIPE-Corrugated Polyethylene non-perforated 36in     LnFt
PIPE-Water supply /fittings, <=2in     LnFt
PIPE-Polyvinyl Chloride 4in     LnFt
PIPE-Perf drain w/gravel filter     LnFt
PIPE-Polyvinyl Chloride 1 1/2in or less     LnFt
VEGETATION-bag lime, seed and fertilizer     Acre
VEGETATION-mulch, small grain straw     Acre
Spring Header Casing     Each
FENCE - SOLAR CHARGER     Each
FENCE-perm, non-electric, incl. Gates     LnFt
FENCE-4+-strand perm, electric, incl. Gates     LnFt
AgWRAP - PUMP*‐water supply Each
AgWRAP - PUMP*‐housing, fiberglass/site 
built
Each
AgWRAP - TANK‐temp storage, 1000 gal Each
AgWRAP - TANK‐temp storage, 1500 gal Each

 

JAA:
Design must be signed and sealed by a Professional Engineer

NRCS Supporting Standards: