Tab/Accordion Items

Description: The use of plants and soils for removal of pollutants from stormwater runoff. Bioretention can also be effective in reducing peak runoff rates, runoff volumes and recharging groundwater by infiltrating runoff.

CCAP Bioretention Area Policy
Requirements for all CCAP practices

Maintenance Period: 5 years single-family home, 10 years all other properties.

Additional Spot Check Requirements: None

BMP Units: Square Feet
Cost Information: Actual cost - paid based on receipts. See CCAP Average Cost List for details. 

CS2 Project Description examples

Expected Results: 

Reference Materials: 
NC-CCAP 11 Signature Page
Map with BMP location, fields, and roads

For RFP:
Receipts for actual cost items

CS2 Common Components Units
CCAP - Bioretention areas - engineering Job

JAA: 
Requires a Professional Engineer stamped design.

NRCS:
NRCS - 393 - Filter Strip
NRCS - 412 - Grassed Waterway