Tab/Accordion Items

Description: A channel constructed across a slope with a supporting ridge on the lower side to control drainage by diverting excess water from an area to improve water quality.  Benefits may include reduced soil erosion, sedimentation, and pollution from dissolved and sediment-attached substances. 

CCAP Diversion Policy
Requirements for all CCAP Practices

Maintenance Period: 5 years single-family home, 10 years all other properties.

Additional Spot Check Requirements: None

BMP Units: Square Feet
Cost Information: Most components are cost shared at 75% of average cost. See CCAP Average Cost List for details. 

CS2 Project Description examples

Expected Results: 
Soil loss reductions - Use RUSLE2

Reference Materials: 
NC-CCAP 11 Signature Page
Map with BMP location, fields, and roads

CS2 Common Components Units
Excavation (including mobilization) SqFt
Vegetation (grass) SqFt
Filter cloth - geotextile fabric SqYd
Vegetation - mulch, netting SqFt
Matting - excelsior, installed SqYd
Diversion - engineering Job

JAA:
Requires a Professional Engineer stamped design.

NRCS:
NRCS - 362- Diversion

Refer to the SWCC JAA Application Requirements for details.