Description: Various techniques to divert runoff from paved surfaces where a vegetated diversion is not feasible. The purpose is to direct stormwater runoff (sheet flow or concentrated) away from a direct discharge point and divert it to an approved BMP or naturally vegetated area capable of removing nutrients through detention, filtration, or infiltration. This may be accomplished through the use of the following: curb cuts, trench drains, raised concrete, or asphalt areas in parking lots, earthen berms, or check dams.

CCAP Structural Stormwater Conveyance Policy
Requirements for all CCAP Practices

Maintenance Period: 5 years single-family home, 10 years all other properties.

Additional Spot Check Requirements: None

BMP Units: Each
Cost Information: Actual cost - paid based on receipts. See CCAP Average Cost List for details. 

CS2 Project Description examples

Expected Results: 

Reference Materials: 
NC-CCAP 11 Signature Page
Map with BMP location, fields, and roads

For RFP:
Receipts for actual cost items.

CS2 Common ComponentsUnits
Structural Stormwater Conveyance    Each
Structural Stormwater Conveyance - engineering    Job

JAA:
Design must be signed and sealed by a Professional Engineer.

NRCS: None

None