Description: Various techniques to divert runoff from paved surfaces where a vegetated diversion is not feasible. The purpose is to direct stormwater runoff (sheet flow or concentrated) away from a direct discharge point and divert it to an approved BMP or naturally vegetated area capable of removing nutrients through detention, filtration, or infiltration. This may be accomplished through the use of the following: curb cuts, trench drains, raised concrete, or asphalt areas in parking lots, earthen berms, or check dams.
CCAP Structural Stormwater Conveyance Policy
Requirements for all CCAP Practices
Maintenance Period: 5 years single-family home, 10 years all other properties.
Additional Spot Check Requirements: None
BMP Units: Each
Cost Information: Actual cost - paid based on receipts. See CCAP Average Cost List for details.
CS2 Project Description examples
Expected Results:
- Soil loss reductions
- Use RUSLE2 for sheet and rill erosion
- For gully erosion, use NRCS Gully Erosion Tool
Reference Materials:
NC-CCAP 11 Signature Page
Map with BMP location, fields, and roads
For RFP:
Receipts for actual cost items.
CS2 Common Components | Units |
---|---|
Structural Stormwater Conveyance | Each |
Structural Stormwater Conveyance - engineering | Job |
JAA:
Design must be signed and sealed by a Professional Engineer.
NRCS: None
None