Description: The use of bioengineering practices, native material revetments, channel stability structures, and/or the restoration or management of riparian corridors in order to protect upland BMPs, restore the natural function of the stream corridor, and improve water quality by reducing sedimentation to streams from streambank.
CCAP Stream Restoration Policy
Requirements for all CCAP Practices
Maintenance Period: 5 years single-family home, 10 years all other properties.
Additional Spot Check Requirements: None
BMP Units: Linear Feet
Cost Information: Actual cost - paid based on receipts. See CCAP Average Cost List for details.
CS2 Project Description examples
Expected Results:
- Soil loss reductions
Reference Materials:
NC-CCAP 11 Signature Page
Map with BMP location, fields, and roads
For RFP:
Receipts for actual cost items
CS2 Common Components | Units |
---|---|
Stream restoration | Feet |
Stream restoration - engineering | Job |
JAA:
Design must be signed and sealed by a Professional Engineer.
NRCS: