Description: An alternative to conventional concrete and asphalt paving materials that allows rapid infiltration of stormwater. Stormwater infiltrates into a porous paving material that provides temporary storage until the water infiltrates into underlying permeable soils or through an underground drain system. This practice is intended to reduce stormwater runoff rate and volume, as well as associated pollutants transported from the site by stormwater runoff.

CCAP Permeable Pavement Policy
Requirements for all CCAP Practices

Maintenance Period: 5 years single-family home, 10 years all other properties.

Additional Spot Check Requirements: None

BMP Units: Square Feet
Cost Information: Conversion is cost shared at 75% of average cost.
Engineering is cost shared at 75% of actual cost.  Maximum of $5,000.
See CCAP Average Cost List for details. 

CS2 Project Description examples

Expected Results: 

Reference Materials: 
NC-CCAP 11 Signature Page
Map with BMP location, fields, and roads

CS2 Common Components Units
Permeable pavement SqFt
Permeable pavement - engineering Job

JAA:
Design must be signed and sealed by a Professional Engineer.

NRCS: None